SS Peter and Paul Church

The work on the parish church included re-roofing, consolidation of the facade plasters, as well as recovery of the decorative graffiti placed on the main front and stone elements. The roof was reconstructed by structural consolidation with suitable and compatible materials, application of waterproof layer covered with the original restored tile covering, all without altering the previous appearance of the roof. The plasters have been completely redone and painted. Graffiti located on the main front of the church has been consolidated through restoration. The stone elements, cleaned of the damage of time, were reconstructed according to the ancient design. The entire execution was monitored by the Ministry of Cultural Heritage as well as the Milan Superintendency.