Interventions at the Garbagnate hospital facility have been carried out in several batches, ensuring continuity of construction for more than a decade. The hospital, consisting of several pavilions, has over the years been equipped with new departments and upgrades to
Interventions at the Garbagnate hospital facility have been carried out in several batches, ensuring continuity of construction for more than
The layout of the new school building reflects its location on a slope in the upper part of the village. In fact, the structure opens on two sides, carving out an access courtyard. Windows mark the rhythm of the facade,where
The layout of the new school building reflects its location on a slope in the upper part of the village.
The new industrial site includes the office building, exterior landscaping and utility works to connect the site with the main road system. The chromatic checkerboard lightens the geometric rigor of the structure and echoes the red color used for the
The new industrial site includes the office building, exterior landscaping and utility works to connect the site with the main
At the intersection of Addolorata Street and Silvio Pellico Street, in a meager urban lot, the existing volume of an old public building from the late 1800s has been restored.The structure arranged on two above-ground floors consists of a single
At the intersection of Addolorata Street and Silvio Pellico Street, in a meager urban lot, the existing volume of an
The geriatric complex, which is strongly promoted by the Giussano community, is located on the outskirts of the town but is well served by connecting urban roads.The health care facility is presented as the articulation of several building bodies connected
The geriatric complex, which is strongly promoted by the Giussano community, is located on the outskirts of the town but
The residential building complements the urban block located in the Germanedo neighborhood in the “upper” part of the city of Lecco.The residence consisting of five apartments arranged on four above-ground floors and a basement, the rectangular plan of the building
The residential building complements the urban block located in the Germanedo neighborhood in the “upper” part of the city of
The school campus used as a middle school, is located in the neighborhood of the town of Lesmo in which other school facilities in the community are located.The school structure is divided into four distinct building bodies in which various
The school campus used as a middle school, is located in the neighborhood of the town of Lesmo in which
The entire renovation of the hospital is discharged in two batches.The intervention adopts solutions and materials consistent with those already in place. These choices safeguard the architectural consistency of the building on the outside, while on the inside it is
The entire renovation of the hospital is discharged in two batches.The intervention adopts solutions and materials consistent with those already
The new multipurpose building houses the post office and town hall offices on the ground floor; the other parts of the structure house municipal apartments. The building appears understated yet elegant by virtue of architectural adoptions such as the entrance
The new multipurpose building houses the post office and town hall offices on the ground floor; the other parts of
The new multifamily building stands in an area of recent urban expansion. The stairwell succeeds in being clearly visible on the main front that recedes as it rises: these accouterments lend lightness to the volumes, emphasize their symmetry, and ensure
The new multifamily building stands in an area of recent urban expansion. The stairwell succeeds in being clearly visible on
The two new residences are symmetrically arranged on a public space, used as a gathering place and parking lot. The buildings are similar in construction language although they differ in length.The roof gable brings back the façade in rigor, to
The two new residences are symmetrically arranged on a public space, used as a gathering place and parking lot. The
The school facility was created to serve the families of the new residential neighborhood, located on the northern outskirts of Lissone, embedded in the residential area park.The building fits overbearingly into the planivolumetric layout of the neighborhood, thanks to its
The school facility was created to serve the families of the new residential neighborhood, located on the northern outskirts of
In the ancient heart of the town center, Cascina Cortazza stands near the parish church. The building’s location inspires a careful renovation that would modernize the site while preserving its constructional stylistic features: the double pitch, the small, sometimes haphazard
In the ancient heart of the town center, Cascina Cortazza stands near the parish church. The building’s location inspires a
The project involved upgrading Villa De Capitani, located in the center of the town of Concorezzo, by converting it into a public building. The work involved the structural consolidation of the envelope and interior floors, as well as the re-roofing
The project involved upgrading Villa De Capitani, located in the center of the town of Concorezzo, by converting it into
The renovation renews the municipal headquarters, founded on the late 19th century, recovering its ancient spaces to new efficiency. The intervention operates on two fronts: to preserve the existing building, indeed designing a garden to ennoble its architectural perception; to
The renovation renews the municipal headquarters, founded on the late 19th century, recovering its ancient spaces to new efficiency. The
The design of the new school building includes a stone basement and a projecting second floor in plaster. The architecture adopts a careful study of solar radiation so that the large windows dose the light appropriately. The projecting body shadows
The design of the new school building includes a stone basement and a projecting second floor in plaster. The architecture
In three phased batches, the construction site improves the provision of services to the hospital facility. The first intervention adds a new sanatorium ward, adhering perfectly to the architectural style of the time.Balconies are oriented and bend in search of
In three phased batches, the construction site improves the provision of services to the hospital facility. The first intervention adds
The renovation of the nursing home performs stairs in external bodies to improve the connection between interior spaces.In the same location, a riser and emergency room are added.To ensure access, the architectural barriers on the ground floor are broken down.Finally,
The renovation of the nursing home performs stairs in external bodies to improve the connection between interior spaces.In the same
Interventions at the Garbagnate hospital facility have been carried out in several batches, ensuring continuity of construction for more than a decade. The hospital, consisting of several pavilions, has over the years been equipped with new departments and upgrades to
Interventions at the Garbagnate hospital facility have been carried out in several batches, ensuring continuity of construction for more than
The layout of the new school building reflects its location on a slope in the upper part of the village. In fact, the structure opens on two sides, carving out an access courtyard. Windows mark the rhythm of the facade,where
The layout of the new school building reflects its location on a slope in the upper part of the village.
The new industrial site includes the office building, exterior landscaping and utility works to connect the site with the main road system. The chromatic checkerboard lightens the geometric rigor of the structure and echoes the red color used for the
The new industrial site includes the office building, exterior landscaping and utility works to connect the site with the main
At the intersection of Addolorata Street and Silvio Pellico Street, in a meager urban lot, the existing volume of an old public building from the late 1800s has been restored.The structure arranged on two above-ground floors consists of a single
At the intersection of Addolorata Street and Silvio Pellico Street, in a meager urban lot, the existing volume of an
The geriatric complex, which is strongly promoted by the Giussano community, is located on the outskirts of the town but is well served by connecting urban roads.The health care facility is presented as the articulation of several building bodies connected
The geriatric complex, which is strongly promoted by the Giussano community, is located on the outskirts of the town but
The residential building complements the urban block located in the Germanedo neighborhood in the “upper” part of the city of Lecco.The residence consisting of five apartments arranged on four above-ground floors and a basement, the rectangular plan of the building
The residential building complements the urban block located in the Germanedo neighborhood in the “upper” part of the city of
Contact us
Fill out the form or call Schiavi Spa to request more information or a consultation.
TELEPHONE
+39 039 60 21 291
SCHIAVI S.P.A. – Impresa di Costruzioni Case Lecco – P.IVA 01970840169 – Cap. Soc. € 5,000,000.00 – R.E.A. BG N. 251728
© SCHIAVISPA.IT all rights reserved – communication by Naxa